The bridge is a unique connection – the result of our own development and implementation – between the existing MG1 building and the newly built MG2 warehouse for the transfer of materials and the passage of people.
With the bridge connection, we guarantee our customers:
- protection of the material from external influences,
- better traceability of the material,
- better information flow,
- more efficient logistics.
The link between the halls means faster material transfer, which takes just 5 minutes and can carry up to 3 tonnes of material at a time.